The expected number of trading days in the variance or correlation swap stream.
Used in:
© 2026.
EPAM Systems. All Rights Reserved.
All material contained within the website is copyright of EPAM Systems, Inc. No material contained herein can be copied or otherwise used without the express permission of the copyright holder.