The number multipled by the derived floating rate of the leg's payment schedule in order to arrive at the payment rate. If omitted, the schedule rate conversion factor is 1.
Used in:
© 2026.
EPAM Systems. All Rights Reserved.
All material contained within the website is copyright of EPAM Systems, Inc. No material contained herein can be copied or otherwise used without the express permission of the copyright holder.