The number of periods in the referenced date schedule that are between each date in the relative date schedule. Thus a skip of 2 would mean that dates are relative to every second date in the referenced schedule. If present this should have a value greater than 1.
Used in:
© 2026.
EPAM Systems. All Rights Reserved.
All material contained within the website is copyright of EPAM Systems, Inc. No material contained herein can be copied or otherwise used without the express permission of the copyright holder.