A rate multiplier to apply to the floating rate. A multiplier schedule is expressed as explicit multipliers and dates. In the case of a schedule, the step dates may be subject to adjustment in accordance with any adjustments specified in the calculationPeriodDatesAdjustments. The multiplier can be less than or greater than 1 (one). This element should only be included if the multiplier is not equal to 1 (one) for the term of the stream.
Used in:
© 2026.
EPAM Systems. All Rights Reserved.
All material contained within the website is copyright of EPAM Systems, Inc. No material contained herein can be copied or otherwise used without the express permission of the copyright holder.