The ComplexEventScheduleGrp is a subcomponent of ComplexEventPeriodGrp for specifying a periodic schedule for an Asian, Barrier or Strike Schedule option feature.
Used in :
| Tag | Field Name | FIXML | Req'd | Comments | |||
|---|---|---|---|---|---|---|---|
| 41031 | NoComplexEventSchedules | Sched | N |
Number of schedules in the repeating group. |
|||
| => | 41032 | ComplexEventScheduleStartDate | @StartDt | C |
Required if NoComplexEventSchedules(41031) > 0. |
||
| => | 41033 | ComplexEventScheduleEndDate | @EndDt | N |
The end date of the schedule. |
||
| => | 41034 | ComplexEventScheduleFrequencyPeriod | @FreqPeriod | N |
Conditionally required when ComplexEventScheduleFrequencyUnit(41035) is specified. |
||
| => | 41035 | ComplexEventScheduleFrequencyUnit | @FreqUnit | N |
Conditionally required when ComplexEventScheduleFrequencPeriod(41034) is specified. |
||
| => | 41036 | ComplexEventScheduleRollConvention | @Roll | N |
When specified, this overrides the date roll convention defined in the DateAdjustment component in Instrument. The specified values would be specific to this instance of the schedule. |
||
© 2026.
EPAM Systems. All Rights Reserved.
All material contained within the website is copyright of EPAM Systems, Inc. No material contained herein can be copied or otherwise used without the express permission of the copyright holder.